on Sunday, according to the Turnpike Commission. Duquesne Bridge, Route 28, Route 910, Freeport Road and back onto the turnpike at the Allegheny Valley Interchange. The following detour routes were also provided by the commission: Westbound traffic: Exit PA Turnpike at Breezewood Follow US Route 30 West for 18.7 miles. Motorists traveling westbound will exit at Pittsburgh and take a 40.9 mile detour following I-376, I-279/Ft. temporarily closed between Breezewood and New Stanton with a detour in place Monday morning. on Saturday.Ĭrews will be removing beams from the original overhead bridge that carries traffic along Center Road over the turnpike at milepost 54.95 in Monroeville.Įastbound traffic will exit at Allegheny Valley and follow a 28.2 mile posted detour using Freeport Road, Route 910, Route 28, I-579, I-376 and back onto the turnpike at the Pittsburgh interchange. Accident Pa Turnpike TodayThe lanes reopened around 3:30 p. Reenter Pennsylvania Turnpike at Breezewood interchange. The turnpike will be closed in both directions between Allegheny Valley (Exit 47) and Pittsburgh (Exit 57) for five hours starting at 11:59 p.m. Motorists are urged to avoid the area, if possible, but if travelling in this region, drivers should pay close attention to the orange and black directional signs.Motorists who need to travel the Pennsylvania Turnpike between the Allegheny Valley and Pittsburgh exits overnight on Saturday will face long detours to get around a bridge construction project. The 90-foot-long bridge opened to traffic on April 1, 1957, and today carries roughly 30,000 vehicles per day, combined north/south.įor 55 hours, the PA Turnpike will implement a detour of I-476 in both directions. The lines in blue mark the Pennsylvania Turnpike Commission’s suggested detour around a bridge project in Beaver County. The new superstructure, which has been under construction since March 2022, is being built near the existing bridge. The construction technique being used - Accelerated Bridge Construction (ABC) - eliminates the need for months or years of single-lane traffic patterns and other motorist restrictions by closing that part of the roadway for a limited period over a weekend. With the development of alternative fuel (AF) vehicle technologies, studies on finding the potential location of AF refueling stations in transportation networks have received considerable attention. On Sunday, its contractor will be removing the temporary bridge that has been over the turnpike at. The lengthy closure is needed for crews to safely demolish the current bridge that carries the Turnpike over Huckleberry Road in South Whitehall Township, Lehigh County, while replacing it with a new steel superstructure that will be installed. The Pennsylvania Turnpike Commission will be removing a temporary bridge this weekend. Purpose: Construction of new Route 981 alignment from Hecla Road to just north of the PA Turnpike. The roadway will be closed in both directions starting at 9 p.m. WILKES-BARRE - The Pennsylvania Turnpike Commission is warning motorists to change travel plans or prepare for a lengthy detour due to a continuous, 55-hour weekend closure planned between the Lehigh Valley Interchange, Exit 56, and the Mahoning Valley Interchange, Exit 74, on the Turnpike’s Northeastern Extension (I-476) from tonight through Monday as workers replace a bridge.
0 Comments
Leave a Reply. |